Plant

Plant 3 — Systems integration hall

Floor size
12,800 m²
Headcount
150
Stations
6
Machines
25
Frame fabrication Machine build Vision & test cells Controls & panel shop Run-in & FAT Packing & dispatch

Plant 3 — Systems integration hall · static preview — interact to load the live 3D scene

Drag to orbit · scroll to zoom · click a station

Station overview

Figures update from a deterministic demo simulation; identical in the 3D view, this list, and the plant page.

Station table

IDStationMachinesCrewCycleStatusOEE
ST-01 Frame fabrication 5 6 8 min Running 77.7%
ST-02 Machine build 6 12 16 min Maintenance 0.0%
ST-03 Controls & panel shop 4 8 9 min Maintenance 0.0%
ST-04 Vision & test cells 5 7 7 min Running 83.4%
ST-05 Run-in & FAT 3 5 22 min Running 76.1%
ST-06 Packing & dispatch 2 4 4.5 min Running 89.5%

Status and OEE come from the same deterministic demo simulation as the twin above — refresh and they agree.

Guided tour

  1. ST-01

    Frame fabrication

    Machine frames are welded and stress-relieved before machining.

  2. ST-02

    Machine build

    Mechanical assembly mounts axes, gantries and end-effectors to the frame.

  3. ST-03

    Controls & panel shop

    Panels are wired and tested to IEC 61131 before integration.

  4. ST-04

    Vision & test cells

    Vision systems and EOL testers are calibrated against golden samples.

  5. ST-05

    Run-in & FAT

    Every cell runs a full factory acceptance test with your product present.

  6. ST-06

    Packing & dispatch

    Cells are packed, documented and dispatched with install crews.