Plant
Plant 3 — Systems integration hall
- Floor size
- 12,800 m²
- Headcount
- 150
- Stations
- 6
- Machines
- 25
Plant 3 — Systems integration hall · static preview — interact to load the live 3D scene
Drag to orbit · scroll to zoom · click a station
Station overview
Figures update from a deterministic demo simulation; identical in the 3D view, this list, and the plant page.
Station table
| ID | Station | Machines | Crew | Cycle | Status | OEE |
|---|---|---|---|---|---|---|
| ST-01 | Frame fabrication | 5 | 6 | 8 min | Running | 77.7% |
| ST-02 | Machine build | 6 | 12 | 16 min | Maintenance | 0.0% |
| ST-03 | Controls & panel shop | 4 | 8 | 9 min | Maintenance | 0.0% |
| ST-04 | Vision & test cells | 5 | 7 | 7 min | Running | 83.4% |
| ST-05 | Run-in & FAT | 3 | 5 | 22 min | Running | 76.1% |
| ST-06 | Packing & dispatch | 2 | 4 | 4.5 min | Running | 89.5% |
Status and OEE come from the same deterministic demo simulation as the twin above — refresh and they agree.
Guided tour
-
ST-01
Frame fabrication
Machine frames are welded and stress-relieved before machining.
-
ST-02
Machine build
Mechanical assembly mounts axes, gantries and end-effectors to the frame.
-
ST-03
Controls & panel shop
Panels are wired and tested to IEC 61131 before integration.
-
ST-04
Vision & test cells
Vision systems and EOL testers are calibrated against golden samples.
-
ST-05
Run-in & FAT
Every cell runs a full factory acceptance test with your product present.
-
ST-06
Packing & dispatch
Cells are packed, documented and dispatched with install crews.