Plant 1 — Main fabrication hall
- Floor size
- 18,400 m²
- Headcount
- 240
- Stations
- 6
- Machines
- 31
Plant 1 — Main fabrication hall · static preview — interact to load the live 3D scene
Drag to orbit · scroll to zoom · click a station
Station overview
Figures update from a deterministic demo simulation; identical in the 3D view, this list, and the plant page.
Station table
| ID | Station | Machines | Crew | Cycle | Status | OEE |
|---|---|---|---|---|---|---|
| ST-01 | Laser cutting | 4 | 3 | 4.5 min | Running | 80.4% |
| ST-02 | Press brake | 6 | 4 | 6 min | Maintenance | 0.0% |
| ST-03 | Machining | 8 | 6 | 9.5 min | Maintenance | 0.0% |
| ST-04 | Welding cells | 8 | 10 | 7.5 min | Running | 74.5% |
| ST-05 | Assembly | 3 | 12 | 12 min | Running | 79.4% |
| ST-06 | Inspection & shipping | 2 | 5 | 5 min | Running | 88.6% |
Status and OEE come from the same deterministic demo simulation as the twin above — refresh and they agree.
Guided tour
-
ST-01
Laser cutting
Fiber lasers cut plate up to 25 mm with a ±0.05 mm position tolerance.
-
ST-02
Press brake
Six press brakes form lengths to 6 m; tooling changed in under 10 minutes.
-
ST-03
Machining
Machining cells finish critical bores and faces after forming.
-
ST-04
Welding cells
Robotic and manual weld cells work to ISO 3834-2.
-
ST-05
Assembly
Assemblies are fitted, torqued and tagged before final inspection.
-
ST-06
Inspection & shipping
CMM checks, documentation packing and outbound staging share one hall.